Electrical Panel Upgrades in Sammamish
A new panel or a larger service when the numbers call for it, with the utility disconnect, the permit and the inspection arranged for you.
Get a panel estimate — (000) 000-0000The work
Upgrade When the Numbers Say So
Panels get replaced for three reasons: no room for new breakers, not enough capacity for what you want to add, or a brand with a poor safety record.
The load calculation tells us which applies. If the panel you have can carry the plan, we say so and price the smaller job instead.
If replacement does make sense, booking the utility disconnect and reconnect is on us, keeping the outage to the shortest window the utility allows.
On the estimate
What a Panel Estimate Itemizes
Load calculation
Why the size we recommend is the right one.
Panel and breakers
The new panel, breakers and any AFCI or GFCI protection required.
Utility coordination
Disconnect and reconnect booked with the power company.
Permit and inspection
Filed, attended and signed off.
On the day
How Changeover Day Runs
- 1
Disconnect
The utility cuts service and we remove the old panel.
- 2
Install and transfer
The new panel goes in and each circuit is moved over and labelled.
- 3
Inspect and reconnect
Once inspected, power is restored and every circuit is checked.
Want this one priced for your house?
A free visit gets you an itemized estimate for exactly this job.