Dedicated circuits for the range, the dryer or the workshop (000) 000-0000

Electrical Remodels in Sammamish

New circuits, moved outlets and fresh lighting laid out against your floor plan, then installed in step with the rest of the renovation.

Plan your remodel wiring — (000) 000-0000
Kitchen under renovation with open walls and new cabinets going in

The work

Wiring That Follows the New Floor Plan

Open walls make a renovation the best-value time to sort out the wiring. It is also the point where many houses turn out to be short of circuits.

We go through the plan room by room: where the appliances land, which counters need outlets, where the lights and switches belong. That becomes the circuit list and the price.

We fit our rough-in around your contractor's schedule so drywall is never held up waiting on us.

On the estimate

What a Remodel Estimate Covers

  • Circuit schedule

    Every new and changed circuit, room by room.

  • Devices and boxes

    Outlets, switches, GFCI and AFCI protection where code needs it.

  • Lighting points

    Recessed, pendant and under-cabinet locations marked on the plan.

  • Inspections

    Rough-in and final inspection booked and attended.

On the day

How We Fit Into the Renovation

  1. 1

    Walkthrough with the plan

    We mark fixture and outlet points on site before framing closes.

  2. 2

    Rough-in

    Boxes and cable go in, ready for the rough-in inspection.

  3. 3

    Trim-out

    After drywall and paint, devices and fixtures go on and every circuit is tested.

Want this one priced for your house?

A free visit gets you an itemized estimate for exactly this job.

Plan your remodel wiring — (000) 000-0000